70174 Stuttgart, Germany
3053 Münchenbuchsee, Switzerland
info@fiugrentheaterschneider.com
Schneider puppet theater
Lukas Schneider puppet theater, info@figurentheaterschneider.com
97262/40314
Without a corresponding note on the respective page, the further use of images and text of any kind requires the written consent of Lukas Schneider Puppentheater and is only permitted if the copyright information is mentioned.
Despite careful checking, Lukas Schneider Puppentheater assumes no liability for the content of external links. The operators are solely responsible for the content of the linked pages. Although Lukas Schneider Puppentheater has taken due care to ensure the accuracy of the information contained on the website at the time of publication, no express or implied responsibility or guarantee (including liability to third parties) is assumed for its accuracy, reliability or completeness. Lukas Schneider Puppentheater therefore assumes no liability for the use or interpretation of the information contained therein. The website is operated to the best of our knowledge and belief.
The process started with drawings of the character. It was supposed to be a kind of forest goblin, where it wasn't exactly clear whether he was good or deceitful. It starts with a rough shape made of foam, covered with volumetric fleece. The nose and other areas are then supplemented and gradually sewn on. Finally, the whole thing is covered with doll jersey and painted. Additional costume pieces and hair and the goblin is ready and can wreak havoc on the world's stages.
Construction at the end of 2021
The process started with drawings of the character. It was supposed to be a kind of forest goblin, where it wasn't exactly clear whether he was good or deceitful. It starts with a rough shape made of foam, covered with volumetric fleece. The nose and other areas are then supplemented and gradually sewn on. Finally, the whole thing is covered with doll jersey and painted. Additional costume pieces and hair and the goblin is ready and can wreak havoc on the world's stages.
Construction at the end of 2021